Ethereum News
Ethereum Fusaka upgrade and the exclusion of EVM Object Format

PeerDAS and Rollup Scalability
The Ethereum Fusaka upgrade launched on December 3, 2025. This update follows the Pectra upgrade. Peer Data Availability Sampling (PeerDAS) provides the primary technical change. PeerDAS allows validators to verify rollups by sampling random portions of data instead of downloading entire blobs. Each full node holds only 1/8th of the total data. This mechanism allows for a theoretical 8x increase in data throughput. Erasure coding ensures that any 50% of the data allows for full reconstruction of the whole. This process keeps the hardware and bandwidth requirements for nodes manageable. The probability of encountering missing or wrong data remains cryptographically negligible, at roughly one in 10^20 to one in 10^24. The increase in blob capacity through PeerDAS allows Layer 2 solutions like Arbitrum and Optimism to process more transactions at lower costs, which could cut data fees for users by 40% to 60% over time. This capability supports a goal of 100,000 transactions per second when combining all Layer 2 activity. Analysts at VanEck suggest this capacity boost makes ETH a settlement currency for the rollup economy. If the price of ETH follows M2 liquidity patterns, Tom Tucker predicts the price could climb to $15,000.
Blob Management and BPO Forks
Ethereum uses Blob Parameter Only (BPO) forks to adjust capacity without a full hard fork. These minor updates change configuration settings rather than protocol rules. The network manages blob supply using Target and Max parameters. The network sets the Max parameter at 1.5 times the Target.
| Stage | Date | Target | Max |
|---|---|---|---|
| Stage 1 (Fusaka) | December 3, 2025 | 6 | 9 |
| Stage 2 (BPO 1) | December 9, 2025 | 10 | 15 |
| Stage 3 (BPO 2) | January 7, 2026 | 14 | 21 |
The first stage launched with a Target of 6 and a Max of 9. This stage provided an observation period to ensure PeerDAS stability under current traffic. The second stage, BPO 1, raised the Target to 10. The third stage, BPO 2, raised the Target to 14 and the Max to 21. Layer 2s pay two separate fees: the blob fee and the execution gas. EIP-7918 prevents the blob fee from dropping to 1 wei by pinning a proportional reserve price under every blob. This ensures the blob fee market always reacts to congestion.
Execution Layer Limits and MODEXP
The execution layer received several changes to improve throughput and security. Developers increased the default block gas limit to 60 million units. This value follows a progression from 30 million to 36 million and then to 45 million. EIP-7825 adds a transaction gas limit cap of 16,777,216 units. This cap prevents a single transaction from consuming an entire block. It also provides protection against denial-of-service attacks.
| Parameter | Limit/Value |
|---|---|
| Default Block Gas Limit | 60,000,000 |
| Max Transaction Gas (EIP-7825) | 16,777,216 |
| MODEXP Min Charge | 500 gas |
| RLP Execution Block Size Cap | 10 MiB |
EIP-7883 changes the pricing for MODEXP to match real computational costs. The minimum charge for MODEXP rose from 200 to 500 gas. The cost climbs more sharply when the exponent input exceeds 32 bytes. EIP-7823 restricts MODEXP input numbers to a maximum of 8192 bits. These changes prevent individual transactions from slowing down block validation. EIP-7934 sets a ceiling on the RLP-encoded execution block size at 10 MiB. The specification includes a 2 MiB safety margin for consensus data. This ensures that blocks propagate cleanly across the network.
The Status of EVM Object Format and Regulatory Shifts
Developers excluded the EVM Object Format (EOF) from the Fusaka upgrade. This decision aimed to streamline development for the 11 proposed EIPs. EIP-7907 also faced exclusion from this release. The exclusion of EOF means the network will not implement this specific contract format in the current upgrade. The roadmap continues with the Glamsterdam upgrade in 2026. One proposal for Glamsterdam involves reducing the block time from 12 seconds to six seconds. The network also aims for a long-term block gas limit of 150 million. Verkle Trees also serve as a feature of the Fusaka upgrade to make verification more lightweight.
The SEC recently met with Ethereum-aligned organizations regarding ERC-3643 and Chainlink’s ACE. Participants included the ERC-3643 Association, Chainlink Labs, the Enterprise Ethereum Alliance, and LF Decentralized Trust. The conversation centered on integrating open standards into the regulatory landscape. Paul Atkins suggested an innovation exemption to accommodate tokenized securities. Does the exclusion of EOF signal a change in how developers prioritize smart contract standards?